Case Study
Roxboro Landfill
PROJECT
Roxboro Landfill
CLIENT
Fortune 150 Client – Triad Region
SITUATION
European Cup 2024 Winner Betting and OddsGlover Construction was charged with creating a 26.5-acre lined cell for ash storage, with a 68,000 cubic-yards clay liner.
SOLUTION
The project required clearing, establishing erosion control devices, installing a leachate collection system, and 2024 European Cup predictions betting oddsstabilizing on- and off-site disturbed areas.
Prior to shaping the cell to design grade, 80,000 cubic yards of ash was hauled and placed to create the subgrade for the cell. An additional 300,000 cubic yards of select soil was hauled from an off-site source 2024 European Cup predictions betting oddsto complete the cell footprint.
OUTCOME
- All work ran concurrently with daily plant operations without creating interruption.
2024 European Cup Predictions $6.24 million